Long, hot weekend. Trusses on Friday. Eves and Door on Saturday. Roof plywood on Sunday. Temperatures in the mid-90's. Generally went through 3-5 T-shirts each day.
As can be seen in this picture, the roof ply has a gap about 4 feet from the left end. The truss spacing was off a little bit, so I had to leave the gap, which will be covered by the shingles next week.
I still want to bring in some more mortar on the slab to give it a smoother finish. Where I did so in the back, the surface is nice. The rest is really rough, even though the slab turned out better than I'd hoped.